Paris Metro - Extension of Line 4

Paris Metro - Extension of Line 4

SYSTRA won the contract to project manage the southward extension of Line 4 of the Paris metro beyond the former terminus at Porte d’Orléans, to Montrouge and Bagneux.

The work was carried out in two phases using conventional construction methods. Phase 1 involved the construction of a station at Mairie de Montrouge; and Phase 2 the construction of two stations “Verdun Sud” and “Bagneux” in a dense urban area.

The full line extension is due for commissioning in 2020 by which time, Line 4 will also have been fully automated and the terminus at Bagneux will connect to Line 15 of the Grand Paris Express.

SYSTRA’s Role

SYSTRA was responsible for full project management from the design phase through to the supervision of civil engineering works (carcass and finishing work) as well as for non-systems related installations (fluids, low voltage power, MEP) during each of the following phases:

  • Preliminary design
  • Detailed design
  • Works contract assistance
  • Planning study certificates
  • Works contract delivery
  • Acceptance operation assistance

SYSTRA was also in charge of the following for the entire project:

  • Coordination technical activities
  • Summarising designs during the construction phase
  • Production of signalling diagrams
  • Conducting and following up on geotechnical surveys
Top of the page

Read also

New York City Transit Consultant Construction Management and Inspection Services for Systemwide Stations Deep Cleaning Initiative
New York City Transit Consultant Construction Management and Inspection Services for Systemwide Stations Deep Cleaning Initiative
SYSTRA is leading the consultant construction management and inspection (...)
East European HSR - Phase 1
East European HSR - Phase 1
SYSTRA was appointed project manager and commissioned to provide assistance (...)
East European HSR – Phase 2
East European HSR – Phase 2
The East European High Speed Railway is a project to create a new (...)
Ostlänken High Speed Rail
Ostlänken High Speed Rail
SYSTRA, in consortium with COWI, won the project management contract to (...)
Southern Europe Atlantic HSL
Southern Europe Atlantic HSL
SYSTRA was appointed project manager for the design of the new Southern (...)
Vilnius Light Rail Transit – Line A
Vilnius Light Rail Transit – Line A
SYSTRA was employed to provide assistance to the contracting authority (...)
Tallinn Light Rail Transit – Lines 1 & 2
Tallinn Light Rail Transit – Lines 1 & 2
SYSTRA was appointed to assist the contracting authority with the (...)
Paris Metro - Extension of Line 14
Paris Metro - Extension of Line 14
SYSTRA was awarded the contract to project manage the extension of Line 14 (...)
WMATA | Design-Build for Andrews Federal Center Bus Operations and Maintenance Facility
WMATA | Design-Build for Andrews Federal Center Bus Operations and Maintenance Facility
SYSTRA was the lead designer for the design-build of a new bus maintenance (...)
MWAA | Dulles Corridor Metrorail Project Phase 2, Package B: Rail Yard and Maintenance Facility
MWAA | Dulles Corridor Metrorail Project Phase 2, Package B: Rail Yard and Maintenance Facility
SYSTRA is the lead designer on the design-build team for a large rail yard (...)
NYCT | CBTC Modernization Program on the Queens Boulevard Line and Canarsie Line
NYCT | CBTC Modernization Program on the Queens Boulevard Line and Canarsie Line
SYSTRA is supporting the project design and ongoing revisions to the (...)
NYCT | Independent Safety Assessor - Signal System Modernization for West 4th and 34th Street Solid State Interlocking Projects
NYCT | Independent Safety Assessor - Signal System Modernization for West 4th and 34th Street Solid State Interlocking Projects
SYSTRA is working as the Independent Safety Assessor (ISA), providing an (...)
SYSTRA USA SYSTRA | New York HQ | 520 Eighth Avenue, Suite 2100, New York, NY 10018
Contact