NJ Transit | Hudson Bergen Light Rail Transit Line Program Management

NJ Transit | Hudson Bergen Light Rail Transit Line Program Management

As part of the program management team, SYSTRA assisted NJ TRANSIT negotiate, process, and administer change orders and payment administration for the HBLRT line.

SYSTRA’s services included defining the scope for change orders and costs for the project, preparation of an independent engineering estimate for the work, analyzing contractor’s proposals for the work against our own estimates, negotiation of costs and quantities with contractor representatives, and preparation of written documentation for NJ Transit procurement. These changes covered all facets of the work from station, track and associated structures, catenary and traction power and signals/communications.

Additionally, SYSTRA was instrumental in the quantity take-offs, labor, equipment, and material costing and negotiations that led to final agreement on the costs for the second operating segment of the line. In particular, SYSTRA developed an independent estimate and analyzed contractor indirect costs
associated with this work valued in excess of $500 million.

SYSTRA also performed construction management oversight and inspection services for the Weehawken Tunnel and Bergenline Avenue Station. This portion of the project was constructed under traditional project delivery (design-bid-build) and is known as Section N30 of the HBLRT system. It consists of over 4,000 linear feet of direct fixation track with a value of $150,000,000.

Top of the page

Read also

East European HSR - Phase 1
East European HSR - Phase 1
SYSTRA was appointed project manager and commissioned to provide assistance (...)
East European HSR – Phase 2
East European HSR – Phase 2
The East European High Speed Railway is a project to create a new (...)
Ostlänken High Speed Rail
Ostlänken High Speed Rail
SYSTRA, in consortium with COWI, won the project management contract to (...)
Southern Europe Atlantic HSL
Southern Europe Atlantic HSL
SYSTRA was appointed project manager for the design of the new Southern (...)
Vilnius Light Rail Transit – Line A
Vilnius Light Rail Transit – Line A
SYSTRA was employed to provide assistance to the contracting authority (...)
Tallinn Light Rail Transit – Lines 1 & 2
Tallinn Light Rail Transit – Lines 1 & 2
SYSTRA was appointed to assist the contracting authority with the (...)
Paris Metro - Extension of Line 14
Paris Metro - Extension of Line 14
SYSTRA was awarded the contract to project manage the extension of Line 14 (...)
Paris Metro - Extension of Line 4
Paris Metro - Extension of Line 4
SYSTRA won the contract to project manage the southward extension of Line 4 (...)
WMATA | Design-Build for Andrews Federal Center Bus Operations and Maintenance Facility
WMATA | Design-Build for Andrews Federal Center Bus Operations and Maintenance Facility
SYSTRA was the lead designer for the design-build of a new bus maintenance (...)
MWAA | Dulles Corridor Metrorail Project Phase 2, Package B: Rail Yard and Maintenance Facility
MWAA | Dulles Corridor Metrorail Project Phase 2, Package B: Rail Yard and Maintenance Facility
SYSTRA is the lead designer on the design-build team for a large rail yard (...)
NYCT | CBTC Modernization Program on the Queens Boulevard Line and Canarsie Line
NYCT | CBTC Modernization Program on the Queens Boulevard Line and Canarsie Line
SYSTRA is supporting the project design and ongoing revisions to the (...)
NYCT | Independent Safety Assessor - Signal System Modernization for West 4th and 34th Street Solid State Interlocking Projects
NYCT | Independent Safety Assessor - Signal System Modernization for West 4th and 34th Street Solid State Interlocking Projects
SYSTRA is working as the Independent Safety Assessor (ISA), providing an (...)
SYSTRA USA SYSTRA | New York HQ | 520 Eighth Avenue, Suite 2100, New York, NY 10018
Contact