New York City Transit Consultant Construction Management and Inspection Services for Systemwide Stations Deep Cleaning Initiative

New York City Transit Consultant Construction Management and Inspection Services for Systemwide Stations Deep Cleaning Initiative

SYSTRA is leading the consultant construction management and inspection services for NYCT’s Stations Deep Cleaning Initiative (SDCI), which involves performance and acceptance of work associated with multiple cleaning contracts, covering 180 subway stations, up to 15 stations simultaneously.

The contract is broken into two phases: pre-cleaning and cleaning being carried out in a two-week scheduling block. Once the work is underway at the current 15 stations, bidding begins for the next 15 stations.

Our work includes daily oversight of work, construction administration, and coordination with other NYCT contracts in line with the agency’s Project Management Procedures (PMPs), Project Management Guidelines (PMGs), and applicable Policy Instructions (PIs).

Top of the page

Read also

East European HSR - Phase 1
East European HSR - Phase 1
SYSTRA was appointed project manager and commissioned to provide assistance (...)
East European HSR – Phase 2
East European HSR – Phase 2
The East European High Speed Railway is a project to create a new (...)
Ostlänken High Speed Rail
Ostlänken High Speed Rail
SYSTRA, in consortium with COWI, won the project management contract to (...)
Southern Europe Atlantic HSL
Southern Europe Atlantic HSL
SYSTRA was appointed project manager for the design of the new Southern (...)
Vilnius Light Rail Transit – Line A
Vilnius Light Rail Transit – Line A
SYSTRA was employed to provide assistance to the contracting authority (...)
Tallinn Light Rail Transit – Lines 1 & 2
Tallinn Light Rail Transit – Lines 1 & 2
SYSTRA was appointed to assist the contracting authority with the (...)
Paris Metro - Extension of Line 14
Paris Metro - Extension of Line 14
SYSTRA was awarded the contract to project manage the extension of Line 14 (...)
Paris Metro - Extension of Line 4
Paris Metro - Extension of Line 4
SYSTRA won the contract to project manage the southward extension of Line 4 (...)
WMATA | Design-Build for Andrews Federal Center Bus Operations and Maintenance Facility
WMATA | Design-Build for Andrews Federal Center Bus Operations and Maintenance Facility
SYSTRA was the lead designer for the design-build of a new bus maintenance (...)
MWAA | Dulles Corridor Metrorail Project Phase 2, Package B: Rail Yard and Maintenance Facility
MWAA | Dulles Corridor Metrorail Project Phase 2, Package B: Rail Yard and Maintenance Facility
SYSTRA is the lead designer on the design-build team for a large rail yard (...)
NYCT | CBTC Modernization Program on the Queens Boulevard Line and Canarsie Line
NYCT | CBTC Modernization Program on the Queens Boulevard Line and Canarsie Line
SYSTRA is supporting the project design and ongoing revisions to the (...)
NYCT | Independent Safety Assessor - Signal System Modernization for West 4th and 34th Street Solid State Interlocking Projects
NYCT | Independent Safety Assessor - Signal System Modernization for West 4th and 34th Street Solid State Interlocking Projects
SYSTRA is working as the Independent Safety Assessor (ISA), providing an (...)
SYSTRA USA SYSTRA | New York HQ | 520 Eighth Avenue, Suite 2100, New York, NY 10018
Contact