East European HSR - Phase 1

East European HSR - Phase 1

SYSTRA was appointed project manager and commissioned to provide assistance to the contracting authority for the first phase of the East European HSR designed to connect Paris to Strasbourg in 2h20.

This line was chosen in 2007 to set the world speed record on rail at 574.8 km/h.

The first phase of the project covered:

  • The creation of three new stations - Champagne-Ardenne, Meuse and Lorraine
  • The construction of 338 structures including 14 viaducts and 5 cut-and-cover tunnels
  • Earthworks, for the construction of 300 km of HSR track base (50 million m3 of spoil and 35 million m3 of backfilling)
  • Delivery of 1,288 km of rails, 3.1 million tons of ballast and 1 million sleepers
  • Track laying switches and crossings, and overhead contact system
  • Construction of five sub-stations to supply power to the overhead contact system
  • Creation of a remote controlled command post and central command post for sub-stations

SYSTRA was responsible for:

  • Technical project management (operational consistency and leadership) for the entire line
  • Project management for civil engineering and railway equipment
  • Assistance to the contracting authority on real estate issues
  • The design/build of the overhead contact system
  • Temporary operation of the line during the construction work
  • Providing escorts for works trains and managing operations at the works depot
Top of the page

Read also

East European HSR – Phase 2
East European HSR – Phase 2
The East European High Speed Railway is a project to create a new (...)
Ostlänken High Speed Rail
Ostlänken High Speed Rail
SYSTRA, in consortium with COWI, won the project management contract to (...)
Southern Europe Atlantic HSL
Southern Europe Atlantic HSL
SYSTRA was appointed project manager for the design of the new Southern (...)
Vilnius Light Rail Transit – Line A
Vilnius Light Rail Transit – Line A
SYSTRA was employed to provide assistance to the contracting authority (...)
Tallinn Light Rail Transit – Lines 1 & 2
Tallinn Light Rail Transit – Lines 1 & 2
SYSTRA was appointed to assist the contracting authority with the (...)
Paris Metro - Extension of Line 14
Paris Metro - Extension of Line 14
SYSTRA was awarded the contract to project manage the extension of Line 14 (...)
Paris Metro - Extension of Line 4
Paris Metro - Extension of Line 4
SYSTRA won the contract to project manage the southward extension of Line 4 (...)
WMATA | Design-Build for Andrews Federal Center Bus Operations and Maintenance Facility
WMATA | Design-Build for Andrews Federal Center Bus Operations and Maintenance Facility
SYSTRA was the lead designer for the design-build of a new bus maintenance (...)
MWAA | Dulles Corridor Metrorail Project Phase 2, Package B: Rail Yard and Maintenance Facility
MWAA | Dulles Corridor Metrorail Project Phase 2, Package B: Rail Yard and Maintenance Facility
SYSTRA is the lead designer on the design-build team for a large rail yard (...)
NYCT | CBTC Modernization Program on the Queens Boulevard Line and Canarsie Line
NYCT | CBTC Modernization Program on the Queens Boulevard Line and Canarsie Line
SYSTRA is supporting the project design and ongoing revisions to the (...)
NYCT | Independent Safety Assessor - Signal System Modernization for West 4th and 34th Street Solid State Interlocking Projects
NYCT | Independent Safety Assessor - Signal System Modernization for West 4th and 34th Street Solid State Interlocking Projects
SYSTRA is working as the Independent Safety Assessor (ISA), providing an (...)
NYCT | Consultant Construction Management Services for Installation of ADA Elevators at Greenpoint Avenue Station
NYCT | Consultant Construction Management Services for Installation of ADA Elevators at Greenpoint Avenue Station
SYSTRA is leading the team managing the pre-construction, construction, and (...)
SYSTRA USA SYSTRA | New York HQ | 520 Eighth Avenue, Suite 2100, New York, NY 10018
Contact